Phase 03

Factory selection and verification.

Choosing the factory is the decision that weighs most on cost and quality. Criteria are stated and the verification report says who checked what.

  1. 01

    Capacity

    Lines, technologies and production capacity against the required volumes.

  2. 02

    Quality systems

    Control processes, documentation and certifications, stating to whom they belong.

  3. 03

    Export record

    Experience with the destination market and similar products.

  4. 04

    Subcontracting and traceability

    Declared external processes and traceability of components and lots.

  5. 05

    Tooling and equipment

    Ownership and custody of tooling regulated in writing.

How verification works

  1. Document audit and sample request
  2. Direct visit or through a third-party inspector
  3. Verification report with comparison sheet

Inspections by accredited third parties are shown as such in the report.

Transparency

The factory is not the party that pays for the consulting: DA COMPLETARE: fee model and absence of commissions from factories, to be confirmed with the owner

Certifications shown are the factory’s, not AM Advisory’s.

Contact

A factory to verify?