Phase 03
Factory selection and verification.
Choosing the factory is the decision that weighs most on cost and quality. Criteria are stated and the verification report says who checked what.
- 01
Capacity
Lines, technologies and production capacity against the required volumes.
- 02
Quality systems
Control processes, documentation and certifications, stating to whom they belong.
- 03
Export record
Experience with the destination market and similar products.
- 04
Subcontracting and traceability
Declared external processes and traceability of components and lots.
- 05
Tooling and equipment
Ownership and custody of tooling regulated in writing.
How verification works
- Document audit and sample request
- Direct visit or through a third-party inspector
- Verification report with comparison sheet
Inspections by accredited third parties are shown as such in the report.
Transparency
The factory is not the party that pays for the consulting: DA COMPLETARE: fee model and absence of commissions from factories, to be confirmed with the owner
Certifications shown are the factory’s, not AM Advisory’s.